ACHIEVEMENTS

OUR projects

texture gcm
BONTERRA

Bonterra Ressources

We coordinated for Bonterra Ressources the environmental studies required to be submitted to the COMEX as part of the impact study for its Barry and Moroy gold project. For this project, our professionals coordinated responses on a wide range of topics: site reclamation, wildlife inventories, wetlands, geochemistry, GHGs, dust and much more.

Arcadium Lihitum

A fine example of personalized long-term support: we work closely with Arcadium Lithium and its teams to help them obtain all the environmental permits and authorizations required for their Galaxy project. Ministerial authorizations, municipal permits, forestry permits, use of public land: our dedicated professionals are versatile and rigorous.

HECLA

Hecla Québec

As part of the development of the Casa Berardi mining site, our team was mandated to carry out a baseline environmental study to support the eventual environmental and social impact assessment. The purpose of the study was to carry out various wildlife and plant inventories to describe the natural environments of the targeted sectors, and to identify the main environmental constraints to infrastructure development (sensitive environments, wildlife habitats, wetlands, species with special status, etc.).  

euille180

Anonyme

Our team carried out an environmental baseline study for an industrial expansion project on an area of over 700 ha. This project required the coordination of various teams specialized in biology from the Abitibi-Témiscamingue region and the rest of the province. The study included stream and fish habitat characterization, wildlife and plant inventories, as well as wetland characterization and delineation.

windfall

Groupe Minier Windfall

Our industrial water treatment team worked closely with Groupe minier Windfall to carry out pre-feasibility and feasibility studies for the Windfall gold project’s water treatment plant. The team also assisted the client in coordinating the various professionals involved in the project to ensure follow-up of schedules and facilitate the transfer of information relating to water use and management plans. 

LECLERC

Leclerc

Our water treatment experts worked with Biscuits Leclerc’s team to implement environmentally responsible water management practices to minimize water use and reduce wastewater loadings. The project also included an analysis of options for implementing innovative and sustainable technologies for industrial wastewater treatment.

laurentides

École Saint-Jean-l’Évangéliste

École Saint-Jean-l’Évangéliste is located in Mont-Laurier. It is an elementary school with a capacity of 100 students, plus staff. The project involved the design of an advanced secondary-level wastewater treatment system for the school, namely a SystemO)) type BOD Expert system with a polishing field. This project was subject to authorization by the MELCCFP (Article 22), and our mandate also included supervision of the work.

tafisa

Tafisa

GCM Enviro Synergies supported Tafisa in its application for financial assistance under the EcoPerformance program to reduce greenhouse gas (GHG) emissions by converting oil-fired boilers to propane. Emissions calculations for the baseline scenario vs. the conversion project demonstrated the concrete reduction in GHG emissions, helping Tafisa to obtain funding from the MELCCFP.

Tell us about your project